[Construction Case] Slab Foundation House: Settlement Correction Work (Tokyo)

No need for large-scale demolition work! Here is an example of correcting a settlement of up to 95mm in just two days of construction.

We would like to introduce a case of "settlement repair work" carried out on a slab foundation house located in Hachioji City, Tokyo. Due to a maximum settlement of 95mm observed, polyurethane resin was injected under the slab foundation to implement the settlement correction. If you are troubled by the tilting of your slab foundation house caused by earthquakes, liquefaction, or ground subsidence, please feel free to contact us. 【Case Overview】 ■ Construction Area: Approximately 43m2 ■ Maximum Settlement: 95mm ■ Area: Hachioji City, Tokyo ■ Construction Period: 2 days *For more details, please refer to the PDF materials or feel free to contact us.

  • Renovation and repair methods
  • Ground foundation construction method
  • Special Construction Method
  • Foundation settlement correction work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Settlement correction work | Foundation settlement cracks addressed with SWS investigation and partial jacking in an ultra-short construction period.

Rapid analysis of partial subsidence and cracks in the foundation using SWS investigation! We will quickly restore it with partial jack adjustments and immediate foundation repairs through digital continuous monitoring.

This proposal is a speed settlement correction solution that achieves millimeter-level high-precision adjustments in an extremely short construction period through the collaboration of digital measurement technology and an elite team, addressing partial subsidence of the foundation and structural cracks. By instantly digitally analyzing the data from the pre-conducted SWS (Screw Weight Penetration) test, we identify the localized soft layers causing the subsidence. During the lifting operation, we use a super high-precision 3D laser level measuring device in conjunction with a small hydraulic jack to accurately return the building to a level position in millimeter increments while monitoring the displacement in real time. For the cracks in the foundation caused by subsidence, we apply pressure injection of high-viscosity epoxy resin to quickly restore the structural strength, and we strongly prevent re-subsidence through the insertion of steel pipe piles into the supporting layer and filling with non-shrink mortar. This process requires no temporary housing or moving, minimizing living stress during the construction period, and swiftly restoring the peace of mind and healthy living environment of a newly built home in a short time.

  • Renovation and repair methods
  • Residential foundations
  • Consulting companies
  • Foundation settlement correction work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Slab Foundation House: Settlement Correction Work (Tottori Prefecture)

No need for large-scale demolition work! Here are examples of cases where a settlement of up to 46mm was corrected.

We would like to introduce a case of "settlement correction work" carried out on a slab foundation house in Unnan City, Tottori Prefecture. Since a maximum settlement of 46mm was observed, resin was injected under the slab foundation to implement the correction. Our company was chosen because the correction could be made without large-scale demolition work or moving. 【Case Overview】 ■ Construction Area: Approximately 106m2 ■ Maximum Settlement Amount: 46mm ■ Area: Unnan City, Tottori Prefecture ■ Construction Period: 2 days *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods
  • Ground foundation construction method
  • Civil Engineering Method
  • Foundation settlement correction work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration